Material Flow & Inventory Visibility
Metal plants manage thousands of similar slabs, coils, and ingots across large yards. Manual logs and barcode scanning fail in high heat and dust, causing 12–15% of WIP to be misplaced and rolling mills to idle 45 minutes per shift while teams search for grades, increasing delays and traceability risk.